Tomorrow the contractor will finish tape and texture, and primer painting will be done Monday. This will complete his contract except for the odds and ends that must be done to finalize. The tile installer has put the tile on the floor in the addition, and is lining the shower area, which is shown below, along with the great room, ready for texture. We moved the appliances back into the kitchen, along with the table, and they all needed serious cleaning.
We started the wood floor in Brendan and Megan's family room today, and it looks wonderful, if I do say so myself. From a production standpoint, we did about 30 sq ft per hour, and got 2/3 of the room done. Tomorrow we will finish it and perhaps finish the dining room. Sunday we will finish the floor if necessary, them move kitchen cabinets from storage to the great room in the addition.