For family and friends... this is about staying in touch with each other. Check out our favorite blogs, links, and news on the right, or read about what is going on in our lives. Anyone can comment on any post (by selecting the comment link at the bottom of the post), or forward our posts to other friends who may be interested via the different methods available at the bottom of each post. Read all comment strings by selecting the post title. If you wish to only view posts on a certain topic, select the appropriate topic in the upper right corner of the page. This will filter the posts.

Monday, August 31, 2009

The Floors are Finished!



We are just about ready for our final inspection! John finished the large task of installing the wood floors for the addition and Brendan installed the wood on the stairs. The banister is up on the stairs. It just needs some stain at some point. The kitchen is complete and all of the appliances are hooked up. They are both working on trim throughout the house - a large task that takes time and patience!

Wednesday, August 12, 2009

Counters and fences...it's looking good!


The long awaited granite tops were delivered and installed today. The first two pictures are the bar area in the dining room followed by John and Barbara's kitchen counters and then their bathroom "grotto." Now we just have to get the faucets in and hooked up and we are good to go. After 4 months of a relatively open back yard, Jameson is nice and secure with the new section of fence up. Of course now that he can relax outside in the sun without running away, he would rather nap on the couch. Go figure!

Monday, August 3, 2009

Goodbye Fred...



We said goodbye to Fred the shed today. It served us well and let us put a ton of things in him. We are very excited to see the backyard again. Got grass anyone?

Sunday, July 12, 2009

Bet You Thought We Were Done...

Well, the answer is no. However, we are really on our way. The tile is done on the main floor as well as all the areas in the bathrooms. John has worked a tremendous amount on his kitchen cabinets and will have them up and ready for appliances by early this week. We also painted and painted and painted. John did most of the ceilings while Barbara and Meg worked on the walls. The great room is just about finished. It is "Svelte Sage" and ready for trim and crown molding. All the furniture is in and Brendan has the speakers throughout the house dialed in with a remote that he can use anywhere (we call it 'Tim Rainwater' style ; )). While we are tired and achy, we are loving the progress and excited for the next week. We expect the plumber and HVAC guys to finish complete their jobs as well as completing a dry wall punch list. We also plan to empty "Fred" our nice trailer that has held everything in our backyard since April. Once Fred is empty we will move dirt and get him hauled away. After that, you all have to come and help us landscape and move in. Sounds like fun, right???
Looking at the pictures, there are two views of the house, one of the shower tile in the boys bathroom upstairs, John and Barbara's bath tile, the main floor bathroom tile, John and Barbara's kitchen cabinets (some of the uppers are not hung yet), and then 3 pictures of the great room as you pan to the left from the fireplace.



Monday, June 29, 2009

Special Posting for Garret and Owen

Well, your Daddy and I worked very hard over the last 4 days, and I have some things to show you. First is your bathroom, without the shower walls and then with them. Also Grammy and Papa's floor with the tub and shower walls.

We finished the floor of the family room and the dining room. First is the dining room when we started to do it, then when it was finished. Then there is a picture of the family room. There sure is a lot of room to play in there!!



Here is another picture of the family room, then we want you to know that Jameson is still interested in only one thing -- bunnies in the front yard. Grammy arrives today, and we can't wait to see you!


Love,
Papa

Friday, June 26, 2009

Contractor Finishing, Wood Floors Starting

Tomorrow the contractor will finish tape and texture, and primer painting will be done Monday. This will complete his contract except for the odds and ends that must be done to finalize. The tile installer has put the tile on the floor in the addition, and is lining the shower area, which is shown below, along with the great room, ready for texture. We moved the appliances back into the kitchen, along with the table, and they all needed serious cleaning.


We started the wood floor in Brendan and Megan's family room today, and it looks wonderful, if I do say so myself. From a production standpoint, we did about 30 sq ft per hour, and got 2/3 of the room done. Tomorrow we will finish it and perhaps finish the dining room. Sunday we will finish the floor if necessary, them move kitchen cabinets from storage to the great room in the addition.

Tuesday, June 23, 2009



Brick, Wallboard, Tile Well, Good Morning! We are seeing some dramatic changes. The brick is done, and we only have to get their extra materials and sandpile removed. The column bases look really nice, and the new brick will eventually be treated with steam cleaning and a preservative.


This is a before and after of the old, coverted garage, and it is being mudded and textured. The bathroom to the left in the middle picture will be tiled as soon as the walls are finished, which should be today. The bathroom for the addition (on the right) will get the wire lath filled, and tile should go on this week. Also, tile went down today on the boys' bathroom upstairs.



Finally, these are two shots of the addition's great room on one of the new garage. Brendan and I will be putting down wood floors this week, and the complete heat pump system should be operational by the end of the week, too.